LD/engineering

Current phase / Preliminary CAD and BOM details

Engineering

The current translation of the completed macro design baseline into controlled engineering definitions.

Preliminary engineering detail
Abstract ivory and green human-form surfaces joined by reflective gold boundaries

Leeloo Digital / Homo sapiens technologicusCurrent phase / Preliminary CAD and BOM details

01 / Technical scope

The current engineering work package must produce preliminary regional CAD, assembly and BOM structures, interface registers, analysis tasks and verification criteria.

A record from the controlled library

The hand: from function to verification.

This public summary is drawn from HST-HND-001, Anthropomorphic hand system, Rev 0.1, dated 20 August 2026. The source document and metadata were inspected on 3 October 2026. Implementation details are withheld.

Required function
Dexterous grasping, manipulation, touch and expressive gesture. The record also requires serviceable interfaces and compliance with allocated body budgets.
Recorded design direction
The hand is treated as a coupled mechanical, sensing and control system within the arm assembly. Left and right variants and replaceable hand elements are included in its definition.
Dependencies to resolve
Wrist integration, the hand movement map and force-transmission choices. Mechanical, power, control, data, thermal, fluid and diagnostic interfaces must be specified together.
Next controlled outputs
Reference geometry and a master assembly; interface and service drawings; a preliminary BOM; and a package-specific analysis and test record. These are planned artifacts, not released outputs.
Planned verification
An instrumented hand rig and standardized grasp/contact tests, supported by kinematic, contact, fatigue and thermal analysis. Quantified acceptance criteria must precede testing.
Present evidence
M3 — Preliminary architecture. Numerical envelopes remain open. The document is a seeded preliminary design record; it contains no completed physical test result or detailed-design approval.

This example demonstrates traceable definition and a test plan. It does not establish dexterity, safety, realism or durability in a built hand.

Work starts from the defined macro-level composition of each body region. The task is to resolve spatial conflicts, assign component records and prepare decisions for engineering review.

These are preliminary definitions. Candidate parts and assembly arrangements can change as analysis and qualification produce evidence.

02 / Integration controls

01

Assembly structure

Defined breakdown from systems to assemblies, subassemblies and components.

02

Interface definition

Controlled structural, movement, power, heat, fluid, data, sensing and service relationships.

03

Engineering review output

Resolved conflicts, approved assumptions, open risks, analysis actions and verification responsibilities.

03 / Current engineering work

CAD, BOM, analysis and verification

01Preliminary CAD

Spatial integration

Regional CAD establishes common coordinate systems, anthropometric envelopes, structural references, joint centers, movement clearances, equipment zones, routing corridors, access volumes and interfaces to adjoining regions.

The purpose is not final surface styling. It is to discover conflicts while systems are still inexpensive to move: an actuator blocking a service path, a thermal route crossing a movement envelope or a protective layer consuming space reserved by sensing.

02Preliminary BOM

Assembly-linked component records

The preliminary BOM decomposes systems into assemblies, subassemblies and component classes. Records identify quantity, functional role, package ownership, interface responsibilities, maturity and whether a candidate is commercial, custom, adapted or unresolved.

This creates the basis for mass and cost estimation, sourcing strategy, make-or-buy decisions, obsolescence planning and verification workload without presenting provisional candidates as selected production parts.

03Analysis campaigns

Analysis by engineering discipline

Structural and fatigue models address load paths; kinematic and dynamic work addresses movement and control; thermal and fluid models address heat and transport; electrical analysis addresses power quality and fault isolation; cybersecurity review addresses trust boundaries and recovery.

Human-factors analysis covers reach, contact, force limitation, perception, expression and service interaction. Each task is linked to the package decision it can confirm, modify or reject.

04Verification planning

Acceptance criteria before testing

The verification basis identifies what will be inspected, analyzed, demonstrated or tested, which configuration is under evaluation and what constitutes pass, conditional acceptance or redesign.

Bounded prototypes are built where analysis alone cannot close a defined uncertainty. Their purpose is to answer that question or verify a controlled requirement; subsystems advance toward integration only after meeting the relevant acceptance criteria.