Program progress
The defined baseline, the preliminary engineering work package and the evidence required for the next release.
Preliminary engineering detail
Leeloo Digital / Homo sapiens technologicusProgram status / Library evidence checked 3 October 2026
Dated delivery record
What is defined. What comes next.
Library evidence check: . The manifest, listed file presence, package identifiers and hand example were checked. This is a document check, not a new hardware milestone or a full engineering review.
Controlled baseline
HST-CDL-001 · Rev 0.1 · established 20 August 2026.
Recorded coverage
624 package records allocated to 28 populated regions within a 29-region program. The research/prototype region currently has no package allocation in the manifest.
Document structure
The 22 August 2026 structure validation is retained. On 3 October, all 624 listed documents and metadata files were present, with 624 unique package identifiers. File presence does not validate their engineering content.
Package maturity
593 records are labeled “Design brief created”; 31 are labeled “Preliminary architecture.” These are document-stage classifications, not completed or independently verified detailed designs.
Current program stage
Preliminary CAD and BOM details. The macro-level design and intended component classes are the starting baseline; spatial definition, component records and review evidence are the next outputs.
Release evidence
No released CAD, BOM, analysis or test outputs were evidenced in the inspected library snapshot. Work outside that snapshot has not been assessed here.
Body and program workstreams — current requirements, not completed CAD releases
Workstream
Macro baseline scope
Preliminary engineering outputs required
Structure & joints
Regional anatomy, structural responsibilities and major component classes.
Movement functions, actuation roles and coordination with the body structure.
Kinematic envelopes, actuator packaging, component records and motion-verification criteria.
Skin, hair & expression
Protective, sensory, expressive and appearance-related functions.
Surface allocation, attachment and service definitions, regional parts lists and evaluation criteria.
Senses & body awareness
Perception functions and their allocation across body and cognition.
Sensor envelopes, integration allowances, signal interfaces and calibration requirements.
Power & thermal control
Energy distribution and temperature-regulation responsibilities.
Preliminary energy and thermal budgets, storage envelopes, protection interfaces and BOM entries.
Fluids & artificial physiology
Internal transport, regulation and service requirements.
Circuit-level allocation, routing allowances, maintenance access and verification plans.
Data, cognition & identity
Control, communication, memory and personal-continuity functions.
Compute allocation, interface definitions, fault behavior and evaluation protocols; subjective experience remains a research question.
Production & lifecycle
Assembly, quality, service and facility functions at program level.
Manufacturing inputs, inspection plans, service definitions and a costed, phased facility plan.
Each row shares the release status above. “Defined” describes intended functions and macro allocation. It does not establish dimensions, final materials, qualified components, manufacturability or measured performance. The next status change requires an identifiable deliverable, revision, review disposition and evidence date.
01 / Technical scope
The HST system concept is complete at functional and macro-design level; preliminary CAD and BOM definition is the active controlled work package.
The preliminary engineering gate requires reviewed regional coverage, resolved first-order spatial conflicts, traceable assembly and component structures, identified cross-system interfaces, preliminary mass, volume, energy and thermal budgets, and a ranked technical-risk register.
03 / Review priorities
Preparing the next review
01Reading the status
A package count is not a hardware completion percentage
The manifest establishes the work breakdown. Maturity is recorded separately for each package, so a populated record does not imply a released drawing, selected component or tested assembly. The delivery table above reports what was actually present in the inspected snapshot.
02Exit review
Preliminary engineering review
The review checks coverage, internal consistency, interface ownership, preliminary budgets, technical risks and downstream analysis requirements. Failed criteria return to the responsible packages as controlled revisions.
Every later maturity claim requires an identified configuration, method, reviewer, result and disposition.
03First campaigns
Shared spatial constraints first
Initial work should establish the human envelope, structural references, joint and movement allocation, high-consequence routing, major energy and thermal zones, service access and the interfaces that constrain many packages at once.
Resolving these shared constraints early reduces the risk of producing detailed local designs that later cannot coexist inside the complete body.
04 / Engineering gates
System concept to physical evidence
These gates are evidence-dependent; no completion dates are committed.
01Complete
System definition
Functional architecture, macro design, package manifest, production model and facility functions.